Home ProductsTransformer Test System

Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

I'm Online Chat Now

Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers
Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

Large Image :  Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

Product Details:
Place of Origin: China
Brand Name: Sansion
Certification: CE/SGS/EMS/ISO 9001
Model Number: SXBZ
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Packaging Details: Plywood Case
Delivery Time: 30 Days
Payment Terms: L/C,T/T,Western Union
Contact Now Chat Now

Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

Description
Name: Transformer Comprehensive Test Bench Voltage Levels: 10 KV, 35 KV, 110 KV, 220 KV And Above
Measurement Accuracy: ±0.2% Or Better Control System: Industrial PC (IPC) And PLC
Test Automation: Fully Automatic Report Formats: PDF Or Excel
Communication Interfaces: Modbus, OPC UA, TCP/IP, SQL Database
Highlight:

Automatic Comprehensive Test Bench

,

Transformer Comprehensive Test Bench

,

Distribution Transformer Test Bench

Automatic Transformer Comprehensive Test Bench For Power And Distribution Transformers With Ratio, DC Resistance, No Load Loss, Load Loss And AC Withstand Voltage Testing 

1. General Information:

SXBZ series Automatic Transformer Comprehensive Test Bench is applied for ex-work and maintenance detecting on various transformers. It's widely used in the fields of power supply and distribution, power transformer manufacturer, transformer maintenance center, industry and mining enterprises.

2. Features:
  • Suitable for transformer voltage levels of 10 kV, 35 kV, 110 kV, 220 kV, and above.
  • The system integrates computer-based automatic measurement and control, enabling one-time wiring for all tests. It features automatic measurement, control, tracking, data analysis, report storage, printing, and protection functions in one complete testing system.
  • All data processing and calculations are performed automatically by the industrial PC (IPC). Test results and curves are displayed directly on the screen, replacing traditional manual recording and calculations. This significantly reduces human error and improves testing accuracy and efficiency.
  • The system provides a highly automated testing process. By utilizing industrial computers and PLC control technology, it offers high measurement accuracy, strong anti-interference capability, reliable operation, and enhanced personnel safety.
  • Integrated data analysis and computer interaction ensure high test precision and computational accuracy, greatly improving work efficiency while reducing labor costs.
3. Test Items:
Routine tests:
  • Transformer insulation resistance testing.
  • Transformer winding resistance testing.
  • Transformer turns ratio testing.
  • Transformer load/no-load current & loss testing.
  • Transformer capacitance & tan delta testing.
  • Transformer short circuit impedance & load loss testing.
  • Transformer power frequency withstand voltage testing.
  • Transformer inductive withstand voltage testing (including 110kv transformer partial discharge testing)
  • Impulse voltage testing (including full wave, chopping wave testing)
  • Transformer oil testing (including, acidity, dewpoint, flashpoint, breakdown, capacitance & tan delta, dissolved gas analysis)
Type tests:
  • Temperature rising testing
Special tests:
  • Zero-sequence impedance testing
  • No load current harmonic testing
4. FAQ
FAQAnswer
What tests can your Transformer Test Bench perform?Our Transformer Comprehensive Test Bench supports Turns Ratio Test, Winding Resistance Test, No-load Test, Load Loss Test, Short Circuit Impedance Test, Applied Voltage Test, Induced Voltage Test, Insulation Resistance Test, Leakage Current Test, Partial Discharge Test (optional), and Temperature Rise Test (optional).
Can the test bench be customized?Yes. We customize the test bench according to transformer type, voltage level, power capacity, testing requirements, factory layout, and automation level.
What transformer types are supported?The system is suitable for power transformers, distribution transformers, dry-type transformers, oil-immersed transformers, single-phase transformers, three-phase transformers, and special transformers.
Which international standards does the equipment comply with?Our equipment can be designed to comply with IEC 60076, IEEE C57, ANSI, GB/T, and other international or customer-specific testing standards.
How accurate are the test results?The system adopts high-precision measurement modules with excellent repeatability. Typical measurement accuracy can reach ±0.2% or better, depending on the test item and configuration.
Is the testing process fully automatic?Yes. The software supports one-click automatic testing, automatic data acquisition, result analysis, Pass/Fail judgment, and report generation, greatly reducing manual operation.
Can the system generate test reports automatically?Yes. Test reports can be automatically generated in PDF or Excel format and include product information, test values, curves, operator information, and Pass/Fail results.
Can the system connect with MES or ERP?Yes. We support Modbus, OPC UA, TCP/IP, SQL Database, barcode scanners, QR code readers, and customized communication interfaces for smart factory integration.
How long does one complete transformer test take?The testing time depends on transformer capacity and selected test items. Routine production testing can usually be completed within a few minutes.
What safety protections are included?The system includes emergency stop, high-voltage interlock, grounding detection, door interlock, over-voltage protection, over-current protection, automatic alarms, and other comprehensive safety measures.
Is operator training provided?Yes. We provide online technical support, installation guidance, on-site commissioning (optional), operator training, maintenance training, and lifetime technical support.
What is the warranty period?Standard warranty is 12 months after commissioning (or according to the contract). Long-term spare parts supply and technical support are available.
Can the software interface be customized?Yes. The software language, testing procedures, report templates, company logo, and communication functions can all be customized according to customer requirements.
Can multiple test stations be integrated into one system?Yes. We can integrate multiple testing stations into a single automated production line to improve efficiency and reduce labor costs.
Why should we choose your Transformer Test Bench?We offer customized solutions, high accuracy, reliable performance, user-friendly software, international standard compliance, smart factory integration, and comprehensive after-sales service for transformer manufacturers worldwide.

Automatic Transformer Comprehensive Test Bench For Power / Distribution Transformers

Contact Details
Sansion Power Electric Co., Ltd.

Contact Person: Miss. Kelly Pan

Tel: +8618186672186

Send your inquiry directly to us (0 / 3000)

Other Products