|
Product Details:
Contact Now
Chat Now
|
| Name: | Transformer Comprehensive Test Bench | Voltage Levels: | 10 KV, 35 KV, 110 KV, 220 KV And Above |
|---|---|---|---|
| Measurement Accuracy: | ±0.2% Or Better | Control System: | Industrial PC (IPC) And PLC |
| Test Automation: | Fully Automatic | Report Formats: | PDF Or Excel |
| Communication Interfaces: | Modbus, OPC UA, TCP/IP, SQL Database | ||
| Highlight: | Automatic Comprehensive Test Bench,Transformer Comprehensive Test Bench,Distribution Transformer Test Bench |
||
Automatic Transformer Comprehensive Test Bench For Power And Distribution Transformers With Ratio, DC Resistance, No Load Loss, Load Loss And AC Withstand Voltage Testing
SXBZ series Automatic Transformer Comprehensive Test Bench is applied for ex-work and maintenance detecting on various transformers. It's widely used in the fields of power supply and distribution, power transformer manufacturer, transformer maintenance center, industry and mining enterprises.
| FAQ | Answer |
|---|---|
| What tests can your Transformer Test Bench perform? | Our Transformer Comprehensive Test Bench supports Turns Ratio Test, Winding Resistance Test, No-load Test, Load Loss Test, Short Circuit Impedance Test, Applied Voltage Test, Induced Voltage Test, Insulation Resistance Test, Leakage Current Test, Partial Discharge Test (optional), and Temperature Rise Test (optional). |
| Can the test bench be customized? | Yes. We customize the test bench according to transformer type, voltage level, power capacity, testing requirements, factory layout, and automation level. |
| What transformer types are supported? | The system is suitable for power transformers, distribution transformers, dry-type transformers, oil-immersed transformers, single-phase transformers, three-phase transformers, and special transformers. |
| Which international standards does the equipment comply with? | Our equipment can be designed to comply with IEC 60076, IEEE C57, ANSI, GB/T, and other international or customer-specific testing standards. |
| How accurate are the test results? | The system adopts high-precision measurement modules with excellent repeatability. Typical measurement accuracy can reach ±0.2% or better, depending on the test item and configuration. |
| Is the testing process fully automatic? | Yes. The software supports one-click automatic testing, automatic data acquisition, result analysis, Pass/Fail judgment, and report generation, greatly reducing manual operation. |
| Can the system generate test reports automatically? | Yes. Test reports can be automatically generated in PDF or Excel format and include product information, test values, curves, operator information, and Pass/Fail results. |
| Can the system connect with MES or ERP? | Yes. We support Modbus, OPC UA, TCP/IP, SQL Database, barcode scanners, QR code readers, and customized communication interfaces for smart factory integration. |
| How long does one complete transformer test take? | The testing time depends on transformer capacity and selected test items. Routine production testing can usually be completed within a few minutes. |
| What safety protections are included? | The system includes emergency stop, high-voltage interlock, grounding detection, door interlock, over-voltage protection, over-current protection, automatic alarms, and other comprehensive safety measures. |
| Is operator training provided? | Yes. We provide online technical support, installation guidance, on-site commissioning (optional), operator training, maintenance training, and lifetime technical support. |
| What is the warranty period? | Standard warranty is 12 months after commissioning (or according to the contract). Long-term spare parts supply and technical support are available. |
| Can the software interface be customized? | Yes. The software language, testing procedures, report templates, company logo, and communication functions can all be customized according to customer requirements. |
| Can multiple test stations be integrated into one system? | Yes. We can integrate multiple testing stations into a single automated production line to improve efficiency and reduce labor costs. |
| Why should we choose your Transformer Test Bench? | We offer customized solutions, high accuracy, reliable performance, user-friendly software, international standard compliance, smart factory integration, and comprehensive after-sales service for transformer manufacturers worldwide. |
![]()
Contact Person: Miss. Kelly Pan
Tel: +8618186672186